Tan Thanh: Townlet embankment project started construction with cost of over 309 billion VND
Tan Thanh district of Long An province started construction of the townlet embankment project with a length of about 3,770 meters, starting at the Canal 12 bridge in the territory of Tan Thanh townlet and ending at the junction of National Highway (NH) N2 – NH 62 in the territory of Kien Binh commune, Tan Thanh district (the South bank); from Canal 12 bridge (old rope bridge) in the territory of Tan Thanh townlet and the end point ends at Canal 43 bridge in the territory of Kien Binh commune of Tan Thanh district (the North bank).
-
Vietnam’s fertility plummets, workforce quality concerns mount: national survey
- Vietnam seeks stronger cooperation with EU, Belgium in environment, sustainable development
- Mekong Delta emerging as plastic waste “hotspot”, experts warn
- Building a synchronous transport system to create momentum for economic development
- Government allocates 140 billion VND to support flood-hit provinces
- New laws on innovation, corporate income tax enacted from October 1
- Vietnam eyes 140,000-strong workforce to power high-speed rail network
- Ministry calls for drastic solutions to reduce air pollution
- Proactively respond to natural disasters
- Accelerating the embankment project in Kien Tuong Ward